Plant Performance

Generation


Logo
 

PLF/CUF

Logo
 

250 MW Surat Lignite Power Plant Phase-II

Parameter Unit Q3 FY 25-26 FY 25-26 FY 24-25 FY 23-24 FY 22-23
Generation MUs 426.86 1199.98 1651.15 1616.71 1538.18
PLF % 77.33 72.73 75.40 73.62 70.24

250 MW Surat Lignite Power Plant Phase-I

Parameter Unit Q3 FY 25-26 FY 25-26 FY 24-25 FY 23-24 FY 22-23
Generation MUs 386.80 1114.48 1513.63 1468.34 1366.06
PLF % 70.07 67.54 69.12 66.86 62.38

165 MW Combined Cycle Power Plant

Parameter Unit  
Generation MUs Station is in-operative since December 2020.
PLF %

145 MW Combined Cycle Power Plant

Parameter Unit   FY 21-22
Generation MUs Station is in-operative since November, 2021. 212.81
PLF % 16.75

Solar

Parameter Unit Q3 FY 25-26 FY 25-26 FY 24-25 FY 23-24 FY 22-23
Installed Capacity MW 937.00 937.00 262.00 262.00 262.00
Net Energy Injected into Grid MUs 287.27 609.86 526.43 536.04 525.01
CUF % 18.40 18.94 22.94 23.29 22.88

Note: 600 MW Khavda Solar Power Plant commissioned in Phases in the period June-December, 2025. 75 MW  Vastan Solar Power Plant commissioned in June, 2025.

Wind

Parameter Unit Q3 FY 25-26 FY 25-26 FY 24-25 FY 23-24 FY 22-23
Installed Capacity MW 112.40 112.40 112.40 112.40 112.40
Net Energy Injected into Grid MUs 35.40 154.04 170.38 209.32 215.60
CUF % 14.26 20.77 17.30 21.20 21.90

 

 
 
 