Prizes won by GIPCL Mining Department during the 25th Mines Environment & Mineral Conservation Week 2017-18

Vadodara Station-I : 145 MW GAS BASED POWER PLANT

Particulars Units Financial Year
2016-17 2017-18
Availability Factor % 98.15 92.81
PLF % 55.26 53.24
Generation MU 701.893 676.21

VADODARA STATION-II : 165 MW GAS BASED POWER PLANT

Particulars Units Financial Year
2016-2017  2017-18 (19.9.2017 to 28.02.2018)
Declared Capacity % 31.34 58.01
PLF % 4.08 5.51
Generation MU 59.011 33.561

SLPP - 4 X 125 MW Lignite Based Power Plant

Particulars Units Financial Year
2017-18 2018-19
Availability Factor % 84.32 86.28
PLF % 74.70 80.40
Generation MU 3271.715 3521.714

PERFORMANCE OF WIND POWER ASSETS

Grid Connected Wind Power Project Financial Year
FY:2016-17 FY:2017-18
Installed Capacity(MW) 112.4 112.4
Net Energy Injected into Grid (MUs) 79.23 243.02

PERFORMANCE OF GRID CONNECTED SOLAR PV ASSETS

Grid Connected Solar PV Power Project Financial Year
FY:2016-17 FY:2017-18
Installed Capacity(MW) 7 87
Net Energy Injected into Grid (MUs) 10.058 81.25

*80MW Charanka Solar Project commissioned in Sept.2017.